Maphuti Tuba (2019) “The Developer’s Right to Enforce a Reversionary Right due to the Failure of the Buyer to Erect Dwellings Within a Prescribed Period: A Real or Personal Right? Bondev Midrand (Pty) Ltd v Puling and Another and a Similar Case 2017 (6) SA 373 (SCA)”, Obiter, 40(3). doi: 10.17159/obiter.v40i3.11200.