Maphuti Tuba. 2019. “The Developer’s Right to Enforce a Reversionary Right Due to the Failure of the Buyer to Erect Dwellings Within a Prescribed Period: A Real or Personal Right? Bondev Midrand (Pty) Ltd V Puling and Another and a Similar Case 2017 (6) SA 373 (SCA)”. Obiter 40 (3). https://doi.org/10.17159/obiter.v40i3.11200.