[1]
Maphuti Tuba 2019. The Developer’s Right to Enforce a Reversionary Right due to the Failure of the Buyer to Erect Dwellings Within a Prescribed Period: A Real or Personal Right? Bondev Midrand (Pty) Ltd v Puling and Another and a Similar Case 2017 (6) SA 373 (SCA). Obiter. 40, 3 (Dec. 2019). DOI:https://doi.org/10.17159/obiter.v40i3.11200.